DOD Acquisition Programs: Status of Selected Systems

Abstract

For the 19 programs discussed in this report, 18 are at or are scheduled to reach milestone II in fiscal year 1988 or 1989 Four of the programs scheduled to reach milestone II will do so without completing the demonstration and validation phase. Eleven programs are at or are scheduled to reach milestone IIIB in fiscal year 1988 or 1989 For 9 of these programs, operational testing has not begun.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1987
Accession Number
AD1167432

Entities

People

  • Frank C. Conahan

Organizations

  • United States Government Accountability Office

Tags

Communities of Interest

  • C4I
  • Ground and Sea Platforms
  • Materials and Manufacturing Processes
  • Sensors
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Aircrafts
  • Airframes
  • Command And Control
  • Command And Control Systems
  • Contracts
  • Control Systems
  • Cost Estimates
  • Ground Stations
  • Launchers
  • Military Acquisition
  • Naval Operations
  • Navy
  • Procurement
  • Radar
  • Remotely Piloted Vehicles
  • Software Development
  • Submarine Warfare
  • Submarines
  • System Software
  • Test And Evaluation
  • Test Equipment
  • Uss Seawolf
  • Warfare

Readers

  • Missile Defense Systems.
  • Personnel Management and Statistics in the Military and Department of Defense
  • Software Engineering