Surplus Plutonium Disposition: NNSA's Long-Term Plutonium Oxide Production Plans Are Uncertain

Abstract

The United States has 57.2 MT of weapons-usable plutonium that it has declared surplus and that still requires disposition. This plutonium exists in various metal and non-metal forms, including pitsthe central core of a nuclear weapon. To prevent insidious use of this plutonium, DOE plans to disassemble pits into metal; convert the plutonium metal to plutonium oxide, a powder-like substance; dilute it with inert material; and dispose of it at WIPP. In May 2018, NNSA issued a plan conceptualizing the dilution and disposal of 34 MT of surplus plutonium at an estimated cost of $19 billion over the next 3 decades. Under this conceptual plan, pit disassembly and production of plutonium oxide would take place at one facility and dilution would be performed in another, with both operations expanding over the next decade.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 2019
Accession Number
AD1173750

Entities

People

  • David C. Trimble

Organizations

  • United States Government Accountability Office

Tags

Communities of Interest

  • Counter WMD
  • Energy and Power Technologies
  • Weapons Technologies

DTIC Thesaurus Topics

  • Ceramic Materials
  • Congress
  • Contracts
  • Cost Estimates
  • Department Of Defense
  • Environment
  • Environmental Management
  • Fabrication
  • Governments
  • Law
  • Life Cycle Costs
  • Life Cycles
  • Materials
  • National Security
  • New Mexico
  • Nuclear Energy
  • Nuclear Fuels
  • Nuclear Materials
  • Nuclear Reactors
  • Radioactive Wastes
  • South Carolina
  • Storage
  • United States
  • United States Government

Readers

  • Environmental Engineering.
  • Nuclear Non-Proliferation and International Security