Developing an Adaptable Best Value Contractor Selection Tool for Federal Construction Projects

Abstract

Currently, there is no Air Force-wide best practice or standard for using an other-than lowest price source selection process for construction projects. Installations often award contracts using Lowest Price Technically Acceptable (LPTA) because ofperceived cost and time savings. However, a heavy reliance on LPTA often leads to long-term decreases in quality and value. To allow the Air Force to receive the best value for its construction funding, a simple and adaptable tool was developed that allows installations to pursue contractor selection for construction projects by other-than lowest price methods.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 2022
Accession Number
AD1174067

Entities

People

  • Robert B Kitson

Organizations

  • Air Force Institute of Technology

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Abstracts
  • Air Force
  • Best Practices
  • Business Administration
  • Case Studies
  • Civil Engineering
  • Construction
  • Contractors
  • Contracts
  • Department Of Defense
  • Engineering
  • Governments
  • Hierarchies
  • Law
  • Literature Surveys
  • Management Personnel
  • Materials
  • Organizational Structure
  • Personnel Management
  • Standards
  • Test And Evaluation
  • United States

Readers

  • Government Contracting/Procurement.
  • Systems Analysis and Design