Test on Switches, Multiple Rotary Submitted by Arrow-Hart and Hegeman Electric Company
Abstract
The sample switches were set up in connection with suitable test equipment where their performances were carefully observed for compliance with the applicable requirements of reference (c) and (d). An inspection, to determine compliance in the matter of materials, design and workmanship, concluded the test.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 25, 1943
- Accession Number
- AD1175599
Entities
People
- G. K. Hardesty
- J. S. Bryant
- W. B. Roberts
Organizations
- United States Naval Research Laboratory