Large Scale Assurance Briefing to Army AvMC
Abstract
Assurance of new capability cannot be provided with the required speed. Inability to integrate the many intertwined types of analyses required for assurance; e.g., control, timing, security, logical correctness. Lack of awareness of assurance interdependence between subsystems; Extensive testing needed to discover interactions between multiple subsystems. Lack of effective reuse of assurance results.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 2023
- Accession Number
- AD1205812
Entities
People
- Dionisio de Niz
- Gabriel A. Moreno
Organizations
- Carnegie Mellon University