Supplemental Environmental Assessment (SEA) for the U.S. Special Operations Command (USSOCOM) Military Information Support Operations (MISO) Military Construction (MILCON) MacDill Air Force Base, Tampa, Florida
Abstract
Construction of the new permanent MISO facility on MacDill AFB in an area south of Southshore Avenue that is currently a vegetated field. The project will involve the construction of an approximately 100,000 square foot two-to-three-story office building sufficient for approximately 850 MISO personnel working there. Considering that the P4 action area (along with 93% of the AFB) is within the 100-year floodplain, the finished elevation of the lowest floor of the building will be constructed above the 100-year flood elevation. There would be an adjacent parking lot with approximately 705 parking spaces. Ingress/egress for vehicles and pedestrians would be from the north via an existing entranceway for a separate facility on Southshore Avenue, and from the south via a new entranceway from Golf Course Avenue. A new culvert would be installed where the new southern entrance roadway crosses a small ditch. Utilities and landscaping would be added. Storm water control features would be constructed to mitigate the effects of the added impervious surfaces.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 2023
- Accession Number
- AD1210228