Production Engineering Measure for a High Power, Fast Switching Silicon Controlled Rectifier.

Abstract

Test results on the First Article Samples showed that subject device could satisfy the intended purpose well. On the approval of the First Article Samples and authorization of starting the Pilot Production Run, the device and encapsulation designs, process and test procedures, and production line organization were reviewed and updated. Modifications for improvements are reported. Initial samples were processed through the line to permit further verification of the production tooling and piece parts. Long term tests were initiated while other materials are issued on a regular interval for the demonstration of production rate. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1974
Accession Number
ADA000835

Entities

People

  • David K.C. Cooper
  • Thorndike C. New

Organizations

  • Motorola Mobility

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Demonstrations
  • Encapsulation
  • Engineering
  • Intervals
  • Materials
  • Production
  • Production Engineering
  • Production Management Methods
  • Production Rate
  • Productivity
  • Rectifiers
  • Silicon Controlled Rectifiers
  • Switching
  • Verification

Readers

  • Electrical Engineering
  • Software Engineering