Tables of Quaternary S-Curves Based on 85%-87% R and D Curves and 67%-99% Production Curves. Volume 7,

Abstract

The Quaternary S-Curve was designed for cost-quantity adjustments necessary under these conditons: (1) when a cost estimate for a change in the production phase is needed and the production cost had there been no change is needed and (2) a relationship is needed to estimate R and D prototype costs, R and D production costs, full scale production preproduction model costs, and full scale production first unit costs. The estimates in (1) are particularly useful in negotiating changes to contracts. The relationships in (2) are useful in estimating Design To Unit Production Costs from cost-quantity data available in the R and D phase. This report contains: Tables of 85% R and D curves; Table of 86% R and D curves; Tables of 87% R and D curves.

Document Details

Document Type
Technical Report
Publication Date
May 30, 1974
Accession Number
ADA001034

Entities

People

  • George V. Johnson

Tags

DTIC Thesaurus Topics

  • Contracts
  • Cost Estimates
  • Costs
  • Models
  • Production

Readers

  • Computational Modeling and Simulation
  • Government Contracting/Procurement.
  • Software Engineering