Condition Survey, Felker Army Airfield, Fort Eustis, Virginia.
Abstract
Subsequent to publication in 1958 of the last report on the airfield pavement facilities at Felker Army Airfield, a new fixed-wing runway and other pavement facilities have been constructed. The report describes these facilities and presents a summary of the load-carrying capacities of pavement facilities at the airfield.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1974
- Accession Number
- ADA003168
Entities
People
- Ralph D. Jackson