Development of a High Seas Oil Recovery System. Phase II. Appendix III. Systems Tests. Volume IV.
Abstract
The Phase-II report covers design, construction, and test of a prototype 2000 gpm oil recovery system for the high seas. The prototype system consists of a weir/basin assembly, transfer and control system, and auxiliary equipment which includes a handling system, packaging system, and a flotsam fence. The transfer system has four hydraulic-motor-driven gear pumps, a 300-ft. hydraulic umbilical, an oil-water interface sensor array, and a remote-control system. The report describes subsystems tests, component assembly, air transport capability, and a complete oil-recovery test in a pool at Battelle Northwest, Richland, Wa. Pool tests utilized light and heavy fuel oils in calm water and 2 foot waves, with tow speeds to 2.76 knots.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1973
- Accession Number
- ADA003947
Entities
People
- Frank A. March
- Joseph Papp
- Louis S. Brown
- Robert L. Beach
- Terrance S. Mcmahon