Final Report of the AMC Committee-Armament. Annexes to Volume 2 - Book 2. Volume 3.

Abstract

Construction costs for the ADC conceptual alternatives were developed for basic facilities (administrative, laboratory and shop space) and for unique or special facilities and equipment. Summary results are tabulated, followed by full development of these costs for each alternative. Finally, these costs are tabulated by fiscal year for each alternative.

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1974
Accession Number
ADA005431

Entities

Organizations

  • United States Army Materiel Command

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • Construction
  • Construction Equipment
  • Laboratory Equipment
  • Observatories
  • Research Facilities

Readers

  • Logistics and Supply Chain Management.
  • Technical Research and Report Writing.

Technology Areas

  • Space