Production Engineering Measure for High Current, Fast-Switching Transistors.

Abstract

During the period, another lot of transistors intended for First Article Testing was processed. Preliminary electrical screening was performed to insure this lot did not fail. The previous lot failed because it did not meet the high current saturation voltage requirements. This was tentatively attributed to the collector portion of the starting epitaxial material being either too thick or too high in resistivity. Group A electrical data is presented. Group B testing was begun.

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1974
Accession Number
ADA005666

Entities

People

  • Frederick G. Ernick

Tags

Communities of Interest

  • Advanced Electronics

DTIC Thesaurus Topics

  • Accumulators
  • Engineering
  • Manufacturing Engineering
  • Materials
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Saturation
  • Switching
  • Transistors

Readers

  • Aerospace Test and Evaluation
  • Integrated Circuit Design and Technology.
  • Plasma Physics.