Determination of Design Verification Program Confluence Assemblies for Balloon System SN 204.

Abstract

This technical report presents the rationale and calculations applicable to the determination of two confluence line assemblies. These assemblies are required for two (2) identified tether points needed to conduct the Design Verification Program Mission with Balloon SN 204. Results of this report have been submitted to TELTA Operations for fabrication action and to the Configuration Control Board (via ECN 200-021) for approval prior to fabrication action by TELTA Operations.

Document Details

Document Type
Technical Report
Publication Date
Nov 28, 1973
Accession Number
ADA006041

Entities

People

  • H. D. Masch

Organizations

  • RCA Corporation

Tags

DTIC Thesaurus Topics

  • Assembly
  • Confluence
  • Fabrication

Readers

  • Business Analytics
  • Fault Tolerant Diagnosis of Black and White Balloon Isolation Tests Using ¥.
  • Hydrologic Risk Analysis and Mitigation.