Determination of Design Verification Program Confluence Assemblies for Balloon System SN 204.
Abstract
This technical report presents the rationale and calculations applicable to the determination of two confluence line assemblies. These assemblies are required for two (2) identified tether points needed to conduct the Design Verification Program Mission with Balloon SN 204. Results of this report have been submitted to TELTA Operations for fabrication action and to the Configuration Control Board (via ECN 200-021) for approval prior to fabrication action by TELTA Operations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 28, 1973
- Accession Number
- ADA006041
Entities
People
- H. D. Masch
Organizations
- RCA Corporation