Army Installation Sampling and Projections.
Abstract
The report develops a scenario of major CONUS and OCONUS Army installations for years 1990-2000. These notionalized installations were in turn used by the Facilities Engineering Support Agency (FESA) to establish future energy requirements in support of the Fixed Facility Energy Systems R and D study. The Engineer Studies Group (ESG) further developed a representative cross section of installations from the CONUS scenario. FESA used that cross section in surveying energy consumption and utilization data and identifying energy-related problems.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1975
- Accession Number
- ADA008952