Analysis of Production Lead Time for Missile Repair Parts: Contracts Dealing with Cable Assemblies and Wiring Harnesses

Abstract

This investigation was undertaken to help in the development of a mathematical model for predicting production lead time on missile repair parts contracts dealing with cable assemblies and wiring harnesses. Techniques of regression analysis and graphical analysis were employed on the data observations from thirty cable assembly and wiring harness contracts.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1975
Accession Number
ADA009177

Entities

People

  • Joseph S. Hill

Organizations

  • United States Army Materiel Command

Tags

Communities of Interest

  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Cable Assemblies
  • Circuit Boards
  • Computer Programs
  • Contracts
  • Databases
  • Digital Information
  • Engineering
  • Governments
  • Information Processing
  • Information Science
  • Lead Time
  • Management Personnel
  • Materials
  • Mathematical Models
  • Production Engineering
  • Regression Analysis
  • Statistical Analysis

Readers

  • Computational Modeling and Simulation
  • Software Engineering
  • Theoretical Analysis.