Results of RFI Testing of Safeguard Flexible Tunnel Section

Abstract

The report discusses results of the RFI shielding-effectiveness testing of a portion of the flexible tunnel section used for joining the equipment tunnels to the linear plate of the SAFEGUARD shielded enclosures. Test results are presented for several modifications to the tunnel section, including the mounting configuration to be used on site. These results indicate that, for most configurations, the shielding effectiveness of the tunnel section does meet the SAFEGUARD EMP specifications. Thus, the choise of configuration and material can be selected for construction convenience.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1975
Accession Number
ADA011225

Entities

People

  • D. J. Leverenz
  • P. H. Nielsen
  • R. G. Mccormack

Organizations

  • Construction Engineering Research Laboratory

Tags

Communities of Interest

  • Advanced Electronics
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Antennas
  • Classification
  • Department Of Defense
  • Dynamic Range
  • Electric Fields
  • Electromagnetic Radiation
  • Electromagnetic Shielding
  • Electronic Equipment
  • Engineering
  • Generators
  • Loop Antennas
  • Materials
  • Measurement
  • Military Standards
  • Signal Generators
  • Test Equipment
  • Test Facilities

Readers

  • Aerospace Test and Evaluation
  • Electrical Engineering
  • Fluid Dynamics.