Production Engineering Measure for Solid-State Microwave Acoustic Delay Lines (Bulk Waves).

Abstract

The object of the investigation was to establish a production capability for microwave acoustic delay lines for the purpose of meeting estimated military needs for a period of two years after completion of the contract, and to establish a base and plans which may be used to meet expanded requirements. This is a General Report on Step II in accordance with paragraph 3.2 and paragraph 3.8 of ECIPPR No. 15, dated 1 August 1970 covering the planning to expand the delay device production rate from 500 to 5000 devices per month.

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1974
Accession Number
ADA011335

Entities

People

  • E. K. Kirchner
  • J. R. Yaeger
  • R. D. Merkley

Organizations

  • Teledyne Technologies

Tags

DTIC Thesaurus Topics

  • Acoustic Delay Lines
  • Contracts
  • Coverings
  • Delay Lines
  • Engineering
  • Management Engineering
  • Management Planning And Control
  • Microwaves
  • Production
  • Production Engineering
  • Production Management Methods
  • Production Rate
  • Productivity

Readers

  • Business Analytics
  • Integrated Circuit Design and Technology.
  • Logistics and Supply Chain Management.