1973 Performance Survey of Dew Line Ice Cap Stations Dye-2 and Dye-3.

Abstract

The report summarizes the findings of the 1973 performance survey conducted by the authors at DYE-2 and DYE-3 from 4 June to 11 July 1973. Field work at each site consisted of elevation surveys of building components (footings, truss collars, truss enclosure, and underside of elevated structure); the POL system (tanks, shafts, and tunnels); and the wastewater disposal system (tunnels, pits, and vents); along with the surrounding snow surface. Temperatures were measured in the surrounding snow, truss enclosure, POL tunnels and sewer tunnels. At each site a comprehensive visual inspection was made of the composite building and its appurtenances.

Document Details

Document Type
Technical Report
Publication Date
May 01, 1974
Accession Number
ADA012112

Entities

People

  • Gary Hine
  • Robert Redfield
  • Wallace Blanchard
  • Wayne Tobiasson

Organizations

  • Cold Regions Research and Engineering Laboratory

Tags

DTIC Thesaurus Topics

  • Composite Materials
  • Elevation
  • Glaciers
  • Ice
  • Inspection
  • Visual Inspection

Fields of Study

  • Engineering

Readers

  • Explosive Engineering.
  • Fluid Dynamics.
  • Structural Dynamics.