Advanced Simulation Center Data Processing System Performance Analysis.
Abstract
Objectives for the current contractual activity were identical to those of the previous contract but were extended in scope and continued for each area, namely: Design verification of the model to assure that the transformation from model design requirements defined by top level logic control chains to detailed SALSIM logic control chains was correct; Preliminary validation of the model to test agreement between the behavior of the model and current information on the performance specifications of the ASC Interface being designed; and, Maintenance and training in the utilization of the model and the simulation language (SALSIM) used to implement the model. (Both the model and SALSIM were previously implemented by TRW Systems on the ASC's CDC 6600 and reside on the disc files of that system.)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1975
- Accession Number
- ADA012310
Entities
People
- D. C. Hall
- R. G. Payne