Electron Beam Semiconductor S-Band Amplifier.
Abstract
During the period a new meander-line deflection structure was designed. A cold test model was built and tested. Fabrication of a test structure to be operated in a beam tester with a phosphor screen was begun.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1975
- Accession Number
- ADA013551
Entities
People
- J. A. Long
Organizations
- Watkins-Johnson Company