Overhaul/Rebuild Cost Study ARMCOM Items
Abstract
Major item historical overhaul/rebuild data, depot labor rates and overhaul cost estimating relationships (CER's) are tabulated in sufficient detail to allow the estimation of overhaul/rebuild cost for ARMCOM-managed items. Item classes addressed in this study are: (1) Artillery; (2) Fire control; and (3) Small arms.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1975
- Accession Number
- ADA014950