Technical Report. Quarterly Report. Second Performance Period.
Abstract
The major SECRAC emphases in the second performance period were on continuing study tasks and completing the TDO S-2 Communication Study. Two new TDO's were initiated, expanding earlier analysis efforts in semiconductor part number reduction and analysis of baseline SAM-D vehicles. Another highlight of the quarter was the SECRAC participation in SAM-D alternate configuration studies: Expanded Sector SAM combined current cost reduction ideas with a unique approach to enlarging the search and engagement sector, and reduced the number of vehicles in the fire section. A task team supported by SECRAC was formed to assess the recommendation (SCRI No. 32) to use the MT-250 crane carrier as radar and launcher vehicle. The analysis of the stiffness of the MT-250 structure was confirmed by TACOM audit, and the findings of the task team paralleled those of the SCRI.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 09, 1974
- Accession Number
- ADA015525
Entities
Organizations
- International Business Machines Corporation (Armonk, NY)