Technical REport. Quarterly Report. Third Performance Period.
Abstract
The major emphasis in the third performance period was applied to TDO's S11 and S12 initiated early in January to address Medium SAM system configuration tradeoffs and performance studies. Portions of the study results, time phased to be responsive to the PMO needs, were delivered in February and March. The recommended simplification, including elements from many of the past and current TDO's, have provided both format and content sources for the PMO baseline description of Medium SAM. The performance studies have used the simulation and analysis tools previously developed by SECRAC to describe the performance details of the proposed Medium SAM system. The SECRAC achievements under these TDO's are reflected by the degree of incorporation of our results in the PMO defined Medium SAM System.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 09, 1974
- Accession Number
- ADA015526
Entities
Organizations
- International Business Machines Corporation (Armonk, NY)