Technical REport. Quarterly Report. Third Performance Period.

Abstract

The major emphasis in the third performance period was applied to TDO's S11 and S12 initiated early in January to address Medium SAM system configuration tradeoffs and performance studies. Portions of the study results, time phased to be responsive to the PMO needs, were delivered in February and March. The recommended simplification, including elements from many of the past and current TDO's, have provided both format and content sources for the PMO baseline description of Medium SAM. The performance studies have used the simulation and analysis tools previously developed by SECRAC to describe the performance details of the proposed Medium SAM system. The SECRAC achievements under these TDO's are reflected by the degree of incorporation of our results in the PMO defined Medium SAM System.

Document Details

Document Type
Technical Report
Publication Date
Apr 09, 1974
Accession Number
ADA015526

Entities

Organizations

  • International Business Machines Corporation (Armonk, NY)

Tags

Readers

  • Clinical Trial Research.
  • Missile Defense Systems.
  • Systems Analysis and Design