Construction Equipment Cost Guide.
Abstract
The purpose of this guide is to assist field pricing support personnel (estimators, negotiators, price analysts, auditors, etc.) in estimating construction equipment hourly ownership and operating rates. The guidance provided is in accordance with general concepts of the contract cost principles and procedures in Armed Services Procurement Regulations (ASPR Section 15) and Federal Procurement Regulations (FPR Part 1-15). The manual is intended for use in negotiated construction procurements which require an independent government estimate by regulation. The original construction contract is awarded as a result of an advertised procurement while contract modifications to advertised procurements are negotiated. The cost estimating concepts of these two procurement types are different.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1975
- Accession Number
- ADA016788
Entities
People
- E. Neely
Organizations
- Construction Engineering Research Laboratory