Production Engineering Measure for an Integrated Power Switch (IPS). Volume III.
Abstract
A complete description of pertinent quality control procedures and requirements and the expected assembly inspection yield for each of the Integrated Power Switch inspection points is given.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1975
- Accession Number
- ADA016857
Entities
Organizations
- Texas Instruments