Risk Analysis of the US Army 155mm Cannon-Launched Guided Projectile Program

Abstract

This analysis estimates the schedule and cost risks associated with the Army 155mm Cannon-Launched Guided Projectile (CLGP) development program. The analysis considered the Army CLGP program from 1 January 1975 to initiation of full scale production. Uncertainties were analyzed by simulating the program using a network format and representing cost and schedule as random variables. Statistics were obtained using the VERT network analyzer. The planned program schedule and costs were found to be close to those obtained from the network analysis

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1974
Accession Number
ADA019932

Entities

People

  • Martin Netzler Jr.

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Classification
  • Contractors
  • Contracts
  • Cost Estimates
  • Costs
  • Fabrication
  • Governments
  • Guided Projectiles
  • Probability
  • Production
  • Projectiles
  • Random Variables
  • Risk
  • Risk Analysis
  • Security
  • Sensitivity
  • Systems Analysis

Readers

  • Computer Networking
  • Life Cycle Cost Analysis
  • ballistics.