Risk Analysis of the 155mm Cannon-Launched Guided Projectile

Abstract

A risk analysis of the schedule and cost associated with the development of the Army 155mm CLGP was performed. The time frame considered for this analysis is 'Begin Engineering Development' in July 1975 to 'Multi-Year Buy'. This analysis is an extension of one performed in Dec 74 and is in preparation for an ASARC/Dsarc 3. The VERT risk analysis technique was employed to perform the analysis.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1976
Accession Number
ADA021189

Entities

People

  • James B. Beeson
  • Martin Netzler Jr.
  • Norman H. Trier

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Base Lines
  • Contractors
  • Costs
  • Engineering
  • Guided Projectiles
  • Probability
  • Production
  • Projectiles
  • Risk
  • Risk Analysis
  • Systems Analysis
  • Uncertainty

Readers

  • Life Cycle Cost Analysis
  • Technical Research and Report Writing.
  • ballistics.