Risk Analysis of the 155mm Cannon-Launched Guided Projectile
Abstract
A risk analysis of the schedule and cost associated with the development of the Army 155mm CLGP was performed. The time frame considered for this analysis is 'Begin Engineering Development' in July 1975 to 'Multi-Year Buy'. This analysis is an extension of one performed in Dec 74 and is in preparation for an ASARC/Dsarc 3. The VERT risk analysis technique was employed to perform the analysis.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1976
- Accession Number
- ADA021189
Entities
People
- James B. Beeson
- Martin Netzler Jr.
- Norman H. Trier