Risk Analysis of the M11OE2 SP Howitzer (from DEVA IPR to Initial Operating Capability).
Abstract
This study was performed to assess the cost and schedule risks associated with achieving Initial Operating Capability (IOC) of the M11OE2 Self-Propelled Howitzer using the XM188E3 propellant charge (Zone 8 only) and firing the M106 Projectile.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1975
- Accession Number
- ADA022359