Development of Multi-Use Shipboard Incinerator. Test Program and Analysis.

Abstract

The report covers the test program carried out on a newly designed multi-use shipboard incinerator. Test procedures and the test stand are described and the test results analyzed in detail. After a series of shake-down tests a formal test program was started consisting of three phases, (a) 24 Factorial Tests, (b) six Replication Tests, and (c) twelve Capacity Tests. The Factorial and Replication Tests were done with simulated refuse, waste and sewage for a set feeding period of 5-1/2 hours. The Capacity Tests were conducted with actual municipal wastes for a feeding period of 10 hours plus additional time required to incinerate 400 gal. of sewage. The results of the extensive test program proved the soundness of the design concept and demonstrated the capability of the unit to meet the contract capacities.

Document Details

Document Type
Technical Report
Publication Date
Jan 30, 1976
Accession Number
ADA022444

Tags

DTIC Thesaurus Topics

  • Contract Administration
  • Contracts
  • Furnaces
  • Heaters
  • Incinerators
  • Shipboard
  • Test Stands

Readers

  • Environmental Engineering.
  • Software Engineering