Grounding, Bonding, and Shielding Practices and Procedures for Electronic Equipments and Facilities. Volume II. Procedures for Facilities and Equipments.
Abstract
This three volume series sets forth a set of grounding, bonding, and shielding principles and practices for electronic equipments and facilities. In Volume 2, the principles and theories are reduced to practical steps and procedures for use in equipment and facility development. Assembly and construction, installation and checkout, and maintenance for long term use are emphasized in this Volume.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1975
- Accession Number
- ADA022608
Entities
People
- H. W. Denny
- J. A. Woody
Organizations
- Georgia Tech