Graphic Line Symbolization System. Volume II. System Implementation, Operating Procedures and Testing.

Abstract

The purpose of Volume 2 of the Final Technical Report is to describe the major attributes of the system implementation, system operating procedures, and summary results of system testing.

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1976
Accession Number
ADA025687

Entities

People

  • John A. Neuffer
  • M. Lynn Taylor
  • Paul D. Bell

Tags

Readers

  • Business Analytics
  • Computer Science.