Graphic Line Symbolization System. Volume II. System Implementation, Operating Procedures and Testing.
Abstract
The purpose of Volume 2 of the Final Technical Report is to describe the major attributes of the system implementation, system operating procedures, and summary results of system testing.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1976
- Accession Number
- ADA025687
Entities
People
- John A. Neuffer
- M. Lynn Taylor
- Paul D. Bell