Backlog and Delay with Wartime Airlift.
Abstract
This report examines the ability of the Navy to deliver wartime passengers on short notice by operating its present fleet of transport planes as a nonscheduled airline. The backlog and delay that would result were estimated with the airfleet servicing four theaters. The estimates were based on multichannel queuing theory. The C-9B and the CT-39E were the most cost effective aircraft to add to the fleet.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1975
- Accession Number
- ADA025959
Entities
People
- Robert Mcquie