Backlog and Delay with Wartime Airlift.

Abstract

This report examines the ability of the Navy to deliver wartime passengers on short notice by operating its present fleet of transport planes as a nonscheduled airline. The backlog and delay that would result were estimated with the airfleet servicing four theaters. The estimates were based on multichannel queuing theory. The C-9B and the CT-39E were the most cost effective aircraft to add to the fleet.

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1975
Accession Number
ADA025959

Entities

People

  • Robert Mcquie

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Aircrafts
  • Military Forces (United States)
  • Military Organizations
  • Multichannel
  • Navy
  • Passenger Aircraft
  • Passengers
  • Transport Aircraft
  • Transport Ships
  • Vehicles

Readers

  • Aerospace logistics and air mobility.
  • Aviation Safety and Air Traffic Management
  • Life Cycle Cost Analysis