Risk Analysis of the M110E2 Self-Propelled Howitzer (From Development Acceptance in-Process Review to Initial Operating Capability)
Abstract
The cost and schedule risk analysis associated with the M110e2 self- propelled howitzer was performed. Uncertainties associated with the time frame between the Development Acceptance (DEVA) In-Process Review (IPR) and Initial Operating Capability (IOC) are considered. Evaluation was accomplished with the Venture Evaluation Review Technique (VERT) network analyzer. Results showed very low risk in achieving IOC within the desired time frame.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1976
- Accession Number
- ADA026680
Entities
People
- Arthur W. Paarmann
- Martin Netzler Jr.
- Thomas N. Mazza