Production Engineering Measure for Polysulfone Capacitors for Short Intrusion Proximity Fuze.
Abstract
First Test Article Report and Gun Shock Test Samples were approved by Harry Diamond Laboratories. Authorization was granted by ECOM to proceed with the pilot run phase of the contract. The Pilot Line Production Rate on the three polysulfone capacitors of the contract was witnessed by a USAECOM engineer and found to be acceptable. Pilot run units were fabricated and approved for life test and acceptance testing. (Author)