Production Engineering Measure for Polysulfone Capacitors for Short Intrusion Proximity Fuze.

Abstract

First Test Article Report and Gun Shock Test Samples were approved by Harry Diamond Laboratories. Authorization was granted by ECOM to proceed with the pilot run phase of the contract. The Pilot Line Production Rate on the three polysulfone capacitors of the contract was witnessed by a USAECOM engineer and found to be acceptable. Pilot run units were fabricated and approved for life test and acceptance testing. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 22, 1976
Accession Number
ADA026906

Entities

People

  • Frank A. Lakowski

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • Capacitors
  • Contracts
  • Engineering
  • Engineers
  • Intrusion
  • Life Tests
  • Production
  • Production Engineering
  • Production Management Methods
  • Production Rate
  • Productivity
  • Proximity Fuzes
  • Research Facilities
  • Shock Tests

Readers

  • Educational Psychology
  • Software Engineering