Summary Report of the St. Louis Airport Investigation - Phase II,

Abstract

Based on forecasts of aviation activity presented in earlier reports under this contract, the Phase II investigation is a comparison of alternatives to meet the demand for air service in St. Louis. The study evaluated alternative transfer dates for initiation of air service from a proposed site near Columbia-Waterloo, Illinois, at 1985, 1990, 1995, and 2000. The evaluation considered economic and noneconomic impacts. Analyses were conducted of airport construction costs, airfield operations costs, airport access facilities costs, airport access travel costs, aircraft noise, air pollution, natural environment impacts, and community development and land use impacts. A financial evaluation was also conducted. A number of sensitivity analyses were also conducted to assist in comparing the alternatives. (Author)

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1975
Accession Number
ADA027185

Entities

People

  • Dan G. Haney

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Air Pollution
  • Aircraft Noise
  • Aircrafts
  • Buildings And Structures
  • Communities
  • Construction
  • Contracts
  • Environment
  • Illinois
  • Landing Fields
  • Noise
  • Sensitivity
  • Terminal Flight Facilities
  • Test And Evaluation

Fields of Study

  • Environmental science

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Hydrologic Risk Analysis and Mitigation.
  • Life Cycle Cost Analysis