Difficulties Review Atlas Booster, Airborne and Ground Support Systems. Book 1. General Information
Abstract
The Difficulties Review encompasses problems gathered from the factory, the field, (ETR and WTR) and UTP. The factory difficulties are limited to 'selloff' and rerun composite testing. In the UTP area, the difficulties were excerpted from Central Test Control Reports, Problem Reports, Supplementary History Sheets and Problem Review Reports. Field problems for the Difficulties Review have been limited to captive flights, flight readiness firings, actual countdown dual propellant loading, quad tanking, component reliability testing, and flight acceptance composite tests. Difficulties called out in the search for critical weakness program was not documented. GSE problems shall be limited to ETR Complex 12, 13, 36A and 36B for the present edition. Hereafter only booster difficulties shall be maintained. Failure analysis reports cover difficulties from the field and factory and may complement the information above. The GSE Difficulties Review, Book 1 contains 14 Volumes, one volume for each system, under one cover. Each volume is appropriately indexed.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 15, 1966
- Accession Number
- ADA027764
Entities
Organizations
- General Dynamics