C/SCSC: Are We Getting Full Benefit by Max Use.

Abstract

This study examines segments of the Cost/Schedule Control Systems Criteria (C/SCSC) to determine maximum utilization as innovative and integrative tools within the program management office. Program management as a method of controlling the development of a weapon system has proven viable. The increasing cost of these systems, however, requires improvement in management efficiency. Cost/Schedule Control Systems Criteria serves to validate the contractor in a way that benefits both the contractor and government interests and, at the same time, facilitates improved efficiency. The reports of management information available to the PM, such as Cost Performance Reports, are productive grounds for management improvement, given current constraints on funding.

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1974
Accession Number
ADA028401

Entities

People

  • Wallace R. Cox

Organizations

  • Defense Systems Management College

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Contract Administration
  • Contractors
  • Contracts
  • Control Systems
  • Efficiency
  • Governments
  • Personnel Management
  • Political Science
  • Program Management
  • Weapon Systems
  • Weapons

Readers

  • Defense Acquisition Program Management
  • Life Cycle Cost Analysis