An Objective Functional Approach to Structuring Contractual Performance Incentives.
Abstract
A method of structuring contractual performance incentives is developed in this report. The method derives the incentive structure directly from the modeled Life Cycle Cost (LCC). The method is illustrated for a hypothetical tactical surface-to-surface missile system and an example is provided of the methods use, at the component level for a single performance parameter, and incorporation into an actual procurement. The method is analysized with existing Multiple Incentive Contracts Analysis Program (MICAP) approaches and a discussion provided.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1975
- Accession Number
- ADA028487
Entities
People
- Paul Edward Pirtle
Organizations
- Defense Systems Management College