Brokke-Senumstad Power Line: Wreck of Double 132 KV Line in Winter (Kraftledningen Brokke Senumstad Harvari av Dobbel 132 KV Ledning i Vinter),
Abstract
The report describes the collapse of power lines in the Brokke-Senumstad power system in Norway. The primary cause of the failure was the breaks in the elements, line guys, outer side guys, suspension devices, etc. The failure occurred after a night of strong winds and supercooled rain.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1976
- Accession Number
- ADA028520
Entities
People
- Olav Egeland
Organizations
- Cold Regions Research and Engineering Laboratory