Evaluation of the L-19A as Modified for Training Purposes.
Abstract
The modified L-19A Airplane was flown in the vicinity of Fort Rucker, Alabama, by personnel of the US Army Aviation Board and the US Army Aviation School for a 14-day period under existing local weather conditions. Tests included an evaluation under those specific conditions obtainable during simulated and actual phases of pilot training.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 23, 1958
- Accession Number
- ADA029760