Consolidation of RPMA at Fayetteville, NC. Volume II. Summary Cost Analysis for Consolidation of RPMA in the Fayetteville, NC Area.
Abstract
This report summarizes the results of an economic analysis performed to determine the feasibility of consolidating real property maintenance activities (RPMA) in the Fayetteville, NC area (Fort Bragg/Pope AFB). Results indicate that consolidation of RPMA at Fort Bragg and Pope AFB using an Army Industrial Fund Organization is feasible and economically desirable. Based on the actual fiscal year (FY) 75 workload, the consolidated organization could generate savings of between $814,000 (2 percent of combined FY 75 cost) and $1,184,000 (3 percent of combined FY 75 cost). Manpower reductions of 83 to 100 (6 to 8 percent) are to be expected. No loss of responsiveness or quality of work is expected. The new implementation costs of $718,000 should be recoverable within the first year of operation. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1976
- Accession Number
- ADA030518
Entities
People
- D. W. Brown
- J. G. Kirby
- J. L. Nay
Organizations
- Construction Engineering Research Laboratory