Consolidation of RPMA at Fayetteville, NC. Volume II. Summary Cost Analysis for Consolidation of RPMA in the Fayetteville, NC Area.

Abstract

This report summarizes the results of an economic analysis performed to determine the feasibility of consolidating real property maintenance activities (RPMA) in the Fayetteville, NC area (Fort Bragg/Pope AFB). Results indicate that consolidation of RPMA at Fort Bragg and Pope AFB using an Army Industrial Fund Organization is feasible and economically desirable. Based on the actual fiscal year (FY) 75 workload, the consolidated organization could generate savings of between $814,000 (2 percent of combined FY 75 cost) and $1,184,000 (3 percent of combined FY 75 cost). Manpower reductions of 83 to 100 (6 to 8 percent) are to be expected. No loss of responsiveness or quality of work is expected. The new implementation costs of $718,000 should be recoverable within the first year of operation. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1976
Accession Number
ADA030518

Entities

People

  • D. W. Brown
  • J. G. Kirby
  • J. L. Nay

Organizations

  • Construction Engineering Research Laboratory

Tags

DTIC Thesaurus Topics

  • Cost Analysis
  • Costs
  • Economic Analysis
  • Maintenance
  • Manpower
  • Workload

Readers

  • Environmental Remediation and Restoration.
  • Life Cycle Cost Analysis
  • Logistics and Supply Chain Management.