Plant Equipment Package Modernization Program. Volume 3. Equipment Layaway Plan.

Abstract

Analysis of current procedures and identification of additional considerations that may be required to lay away production facilities and equipment for reliable fast reactivation to meet mobilization requirements. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1976
Accession Number
ADA031294

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Ammunition
  • Circuit Boards
  • Construction
  • Contracts
  • Control Panels
  • Department Of Defense
  • Economic Analysis
  • Engineers
  • Environment
  • Industrial Equipment
  • Maintenance
  • Management Personnel
  • Manufacturing
  • Procurement
  • Test And Evaluation
  • Test Equipment
  • Turbines

Readers

  • Defense Acquisition Program Management
  • Industrial Economics