Logistical Evaluation of T53-L-7 Engine in an OV-1C Airplane.
Abstract
This report reflects logistical support requirements for T53-L-7 engines in terms of maintainability, reliability, and supportability. A schedule of 12 hours per day, five days per week, for a total of 1200 flying hours has been established. This report covers results of the first 300 hours of a 1200-hour test program. Conclusions and recommendations are being withheld until the end-of-test report. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 26, 1963
- Accession Number
- ADA031887