Logistical Evaluation of T53-L-7 Engine in an OV-1C Airplane.

Abstract

This report reflects logistical support requirements for T53-L-7 engines in terms of maintainability, reliability, and supportability. A schedule of 12 hours per day, five days per week, for a total of 1200 flying hours has been established. This report covers results of the first 300 hours of a 1200-hour test program. Conclusions and recommendations are being withheld until the end-of-test report. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 26, 1963
Accession Number
ADA031887

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Aircrafts
  • Airframes
  • Airplanes
  • Assembly
  • Combustion
  • Combustion Chambers
  • Engineering
  • Engines
  • Gages
  • Gases
  • Ignition
  • Indicators
  • Inspection
  • Maintenance
  • Power
  • Pressure Gages
  • Test And Evaluation

Readers

  • Life Cycle Cost Analysis
  • Military Science