Report on the Final Acceptance Test for CTS (Computerized Training System).

Abstract

This report describes the conduct and results of the Phase 3 Acceptance Test for CTS. HumRRO researchers developed acceptance test plans for the Computerized Training System (CTS) being developed by the Army. Three separate plans were formulated to correspond to the three hardware and software deliveries. Each plan is successively more comprehensive than its predecessors. The primary objective of these three plans is the verification of the vendor's meeting of the CTS specification as well as the performance characteristics. The primary objectives of the test were to determine whether the full 128-terminal system will operate under operational live user conditions and meet contract requirements for reliability and response time.

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1976
Accession Number
ADA033400

Entities

People

  • Beverly Hunter

Organizations

  • Human Resources Research Organization

Tags

DTIC Thesaurus Topics

  • Acceptance Tests
  • Contracts
  • Reliability
  • Specifications
  • Terminals
  • Training
  • Verification

Readers

  • Instructional Design and Training Evaluation.
  • Medical Imaging.
  • Software Engineering