Implementation and Acceptance Testing of the Seismic Communication and Control Processor
Abstract
The Seismic Communication and Control Processor (CCP) was assembled and programmed during the period September 1974 to August 1975 using the BBN PLURIBUS multiprocessor architecture. Acceptance testing of the CCP was dependent on and interwoven with implementation and testing of the other nodes in the Seismic Data Network. Acceptance testing was divided into five phases. The last test phase was completed February 6, 1976.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 09, 1976
- Accession Number
- ADA033541
Entities
People
- Howard W. Briscoe
Organizations
- BBN Technologies