Implementation and Acceptance Testing of the Seismic Communication and Control Processor

Abstract

The Seismic Communication and Control Processor (CCP) was assembled and programmed during the period September 1974 to August 1975 using the BBN PLURIBUS multiprocessor architecture. Acceptance testing of the CCP was dependent on and interwoven with implementation and testing of the other nodes in the Seismic Data Network. Acceptance testing was divided into five phases. The last test phase was completed February 6, 1976.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 09, 1976
Accession Number
ADA033541

Entities

People

  • Howard W. Briscoe

Organizations

  • BBN Technologies

Tags

Communities of Interest

  • Energy and Power Technologies
  • Sensors

DTIC Thesaurus Topics

  • Acceptance Tests
  • Air Force
  • Application Protocols
  • Communication Systems
  • Computer Programming
  • Computers
  • Detection
  • Hard Copy
  • Quality Control
  • Reliability
  • Simulators
  • Sine Waves
  • Software Development
  • Square Waves
  • Stations
  • Step Functions
  • Waveforms

Readers

  • Aerospace Test and Evaluation
  • Seismology
  • Software Engineering.