DCS Operational Test and Evaluation of PCM/TDM Equipment.
Abstract
This report expands the investigation of overhead channel performance, VF channel assessment and system performance monitoring. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1975
- Accession Number
- ADA033776