Study of Land Use for Recreation and Fish and Wildlife Enhancement. Appendix D, Volume I. Case Studies D-1-1 to D-5-1.
Abstract
Material contained in Appendix D represents the compilation of research on the task entitled 'inspect and Analyze a Representative Sample of Corps of Engineers Administered Lakes'. Twenty-nine lakes Water Resource Development Projects, nation-wide, were selected for consideration. Case study areas D-1 to D-5 are: Wappapello Dam and Reservoir, Missouri; Lake Ouachita (Blakely Mountain), Arkansas; Fort Peck Reservoir, Montana; Oahe Reservoir, North and South Dakota; and Colebrook River Lake, Connecticut/Massachusetts.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1975
- Accession Number
- ADA034147