FARE Camouflage Development. Volume II. Evaluation and Revisions.

Abstract

The results of field evaluations performed at NERA and MERDC facilities are detailed and a rationale developed for the choice of rapid-deploying nets and surface camouflage treatment (disrupters) as preferred methods for camouflaging FARE. Revisions of submitted Requirements and Development Documentation have been developed to reflect in-process review and new information developed as the result of field trial and study.

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1975
Accession Number
ADA035021

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • Camouflage
  • Test And Evaluation
  • Test Facilities

Readers

  • Applied Combinatorial Optimization and Logic Circuit Design.
  • Image Processing and Computer Vision.
  • Software Engineering