8-Man Squad Analysis of ARTEP 5-145.
Abstract
The study examined the tasks and sub-tasks of the Army Training and Evaluation Program (ARTEP) in the Mechanized/Armored Division Engineer Battalion to Determine the impact of reducing squad strength to 8-men on task performance. Findings are based on comparison of expected squad performance versus the present task standard for a 10-man squad. Analysis used the appropriate field and technical manuals to develop the comparisons where possible. Comparison and analysis of tasks led to suggested revisions of the squad level ARTEP AS WELL AS IDENTIFICATION OF AREAS FOR OPERATIONAL FIELD TESTING TO DEVELOP REVISED STANDARDS. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 03, 1977
- Accession Number
- ADA035101
Entities
People
- Buckner Creel
- Clifford Elliott
- Donald Bush
- Mark Pell
Organizations
- United States Army Engineer School