Guided Missile Frigate (FFG-7) Air Detachment Requirements.
Abstract
This project addressed selected logistic support requirements needed to sustain SH-2F helicopters aboard the new class ship, Guided Missile Frigate (FFG-7). The study identified and documented air/ship interface requirements, ground support equipment, test equipment requirements, packup kit range and depth, weight and cube of spares and repair parts, Individual Material Readiness List, mooring aids, and equipment (Allowance Equipage List), and recommended additional evaluation of a flight deck communication system (MAGnetic Induction Communication). A Logistic Support Conference defined logistic issues requiring resolution. The study group, coordinated by the NAILSC team, proposed and assigned action on each item. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1976
- Accession Number
- ADA036580
Entities
People
- Anthony V. Liberti
- Charles W. Chandler